Now for some inside work...

Well now that we have the addition up and almost done on the outside, we can start working on the upstairs inside. To start that though, we needed to tear out our living room ceiling because that is also the master bedrooms floor and it slopes like a soup bowl lol! The living room ceiling height went from 6'7" against the wall and in the center of the room it was 6'3", after we got the joists in the whole thing is 7'5". Here are some pics of that in progress with a few before pics of what the ceiling looked like...


The hole in the ceiling is from where there used to be an old pot belly woodstove in there. The pipe went from the living room ceiling, through the upstairs bedroom floor, and then out that ceiling and through the roof.


Here are the new joists:

And here is the new floor going down in the master bedroom: